Construction Basic Price

BASIC PRICE 2019



COMPARISON OF RATES (MAIN BUILDING)
          1             2           3
SEC DESCRIPTION Unit  AMOUNT   AMOUNT   AMOUNT 
PILING WORKS
1 Provide and dismantle item        2,000.00       27,000.00       26,000.00
2 Maintain Piling item        1,000.00        7,000.00        6,500.00
3 Allow For moving Piling equipment item        2,000.00        7,000.00        6,500.00
4 Piling record item        5,000.00        1,300.00        1,300.00
5 Supply, Deliver and unload 250mm x 250mm Initial Pile m             80.00             60.00             91.00
6 Supply, Deliver and unload 250mm x 250mm extension Pile m             90.00             79.00           106.60
7 Handle Transport and Pitch 250mm x 250mm Initial Pile no             10.00             14.00             26.00
8 Handle Transport and Pitch 250mm x 250mm extension Pile no               5.00             14.00             26.00
9 Drive only precast reinforced 250mm x 250mm initial pile m             10.00             27.00             13.00
10 Drive only precast reinforced 250mm x 250mm extension pile m             10.00             27.00             13.00
11 Prebored vertical hole minimum  250mm m             50.00             60.00             97.50
12 Fillet weld connection no             30.00             20.00             32.50
13 Cut Off  250mm x 250mm no             30.00             20.00             52.00
14 Pile Test no        1,500.00       20,000.00       10,920.00
15 Provide all necessary plant equipment labour 250mm x 250mm precast RC piles no        1,200.00        1,300.00        1,170.00
STRUCTURE
16 Excavate oversite to reduce level  m3             20.00             20.00           281.00
17 150mm Thick Hardcore  m2             18.00             22.00             20.00
18 concrete grade 10 m3           225.00           250.00           230.00
19 Reinforced Concrete Grade 30  m3           300.00           330.00           310.00
20 Mild Steel Reinforcements to BS 4449 kg               4.00               3.80               4.20
21 High Tensile Reinforcements to BS 4449 kg               4.00               3.80               4.20
22 BRC A8 m2             22.00             22.00             22.50
23 BRC B8 m2             28.00             25.90             38.70
24 Formwork Class F1 Exceeding 500mm high m2             48.00             42.00             45.00
25 Formwork Class F1 not Exceeding 500mm high m2             26.70             37.90
26 Layer approve waterproofing m2             50.00             53.30               8.20
27 Anti termite m2           10.50              4.20             5.00
28 Provide Mackintosh probe (MP) item           500.00        5,000.00






ARCHITECHTURE
29 200mm Thick common clay brickwall m2           76.00           80.00          94.00
30 200mm wide approved bituminious felt damp proof  m             10.00               1.20               1.60
31 6mm x 450mm long mild steel bar  no               3.00               0.50               0.60
32 100mm thick common  clay brickwall m2             38.00             40.00             47.00
33 100mm wide approved bituminious felt damp proof  m2               5.00               0.60               0.80
34 Precast concrete Grade 25 lintol m             60.00           352.70           102.50
35 Supply and fix aluminium lourved window 2400mm x 600mm no           500.00           510.00           572.00
36 Supply and fix aluminium lourved window 3000mm x 600mm no           630.00           640.00           715.00
37 Supply and fix aluminium lourved window 1200mm x 600mm no           250.00           250.00           293.00
38 Supply and fix aluminium lourved window 2400mm x 2400mm no        2,000.00        2,040.00        3,418.00
39 Supply and fix aluminium lourved window 1000mm x 600mm no           210.00           210.00           437.00
40 Supply and fix aluminium lourved window 3000mm x 600mm no           630.00           640.00           715.00
41 Supply and fix aluminium lourved window 1800mm x 600mm no           400.00           380.00           572.00
42 Supply and install mild steel louvres size 2400mm x 2400mm no        1,500.00        3,840.00        2,405.00
43 Plywood flush door size 900mm x 2100mm no           500.00           280.00        1,440.00
44 Fire rated door size 1000mm x 2100mm no           600.00        1,600.00        2,340.00
45 Fire rated door size 2000mm x 2400mm no        3,500.00        2,030.00        5,221.00
46 Fire rated door size 1200mm x 2100mm no        2,500.00        1,600.00        2,587.00
Guocera Porcelain Tiles
47 300mm x 300mm Guocero KV 945 m2           70.00             85.00            100.00
Ceiling Finish
48 5mm thick approved skim coat m2             20.00              13.00              12.50
49 Mineral Acoustic Moisture resistance ceiling board m2           100.00             50.00             66.00
50 Prepare and apply one coat and two coats of approved emulsion paint
m2               6.20               7.50               7.00
51 Mineral fibre ceiling board m2           100.00             46.70             66.00
Internal Wall Finish
52 Cement and sand mixed with and approved plasticer 20mm thick m2             50.00             20.00             58.40







INFRASTRUCTURE WORKS
53 Site clearence acre        3,000.00        6,700.00        5,500.00
54 Cut and Fill (>10,000m3) m3             7.00             13.30             4.70
55 Imported Fill M3             30.00             33.30             28.00
56 Excavate Earth Drain M             30.00             13.30             47.40
57 Silt Trap No       10,000.00       10,700.00       22,600.00
58 Wash Through No        3,500.00        9,300.00     166,100.00
Roadworks and Hardstanding
59 Excavate Oversite to reduce level M3             10.00             10.70             14.20
60 Trim level M2               5.00               4.00               2.90
61 50mm Thick bed M2               6.00               6.00               9.40
62 300mm Thick crusher run M2             27.00             31.50             35.00
63 Prime coat for Binder coarse 60mm Thick M2               3.00               1.30               3.20
64 Binder coarse M2             46.00             41.90             60.40
65 Prime coat for wearing coarse 40mm Thick M2               3.00               1.30               3.20
66 Wearing Coarse M2             35.00             32.20             47.10
67 Road Kerb M           100.00             53.30           126.30
Surface Water Drainage
68 Supply 300mm Spun Concrete M             70.00           200.00           285.60
69 Supply 375mm Spun Concrete M             80.00           270.00           333.30
70 600mm x 450mm Box Culvert M           600.00           330.00        1,197.00
71 1320mm x 1320mm Brick Sum No        1,500.00        1,330.00        4,348.00
72 1320mm x 1295mm Brick Sum No        1,500.00        1,330.00        4,308.00
Water Reticulation
73 150mm MS Pipe M           250.00           120.00           163.00
Sewerage
74 225mm VCP pipe M           250.00           160.00           200.60
Turfing & Walkway
75 Top Soil M2               2.50               2.20               3.00
76 Closed Turfing M2               4.70               4.00               5.80
Fencing and Gate
77 Standard Anti Climb Fencing M           300.00           470.00           472.00

Nota: Harga Sentiasa berubah - berubah mengikut keadaan semasa. Harga yang terdapat di sini adalah berdasarkan Projek - projek kami di Johor. Mungkin di tempat lain harganya berbeza.

13 comments:

  1. Blog yang sangat Berguna.. Terbaik sekali.. Terima kasih... Blog ini sangat beruguna kepada orang seperti saya yang langsung tidak tahu mengenai proses pembinaan. Saya baru sahaja memberi kerja extension kepada seorang Tukang dari tempat saya. Jadi saya ingin tahu apa yang dibuatnya dan saya jumpalah blog encik ni. Memang terlalu baik blog ini dan mudah difahami.. Terima Kasih sekali lagi dan teruskan usaha anda ini.. Sharing is Caring...

    ReplyDelete
  2. Terima kasih... Tetapi encik perlu berhati2 kerana harga yang di atas boleh berubah - ubah mengikut keadaan semasa. Harga ini adalah daripada senarai beberapa petender kepada beberapa projek saya.

    ReplyDelete
  3. amount 1, 2 dan 3 tu maksudnye rate dr beberape supplier atau subcont ker?..sb sy x pasti mana price nye..sb skrang sy tengah prepare form utk calculation rate bagi road kerb..sy perlu tahu harga dlm per nos..utk dptkan harga dlm 1 meter.

    ReplyDelete
    Replies
    1. Harga-harga tersebut merupakan harga average bidder dari setiap Main Contractor yang masuk tender projek saya. Untuk penghujung tahun 2017 ni saya masih lagi tidak cukup info untuk update harga

      Delete
  4. Blog yang sangat berguna TQ. Cuma nak tanya perbezaan diantara amount 1 2 dan 3. TQ

    ReplyDelete
  5. Bolh tak send qoutation harga untuk sewa mesin rc pile..tolong email qoutation kat sya

    ReplyDelete
  6. I want to share with you all here on how I get my loan from Mr Benjamin who help me with loan of 400,000.00 Euro to improve my business, It was easy and swift when i apply for the loan when things was getting rough with my business Mr Benjamin grant me loan without delay. here is Mr Benjamin email/whatsapp contact: +1 989-394-3740, lfdsloans@outlook.com / lfdsloans@lemeridianfds.com.

    ReplyDelete
  7. Mcamna nk dapat personal kol kpd sale dept u..ada no fon tak

    ReplyDelete
  8. Tuan bleh kongsi kontak kontraktor piling di semenanjung malaysia

    ReplyDelete
  9. CAN HELP ME BQ RATE FOR CASSION PILE AVG 21.45 M DEEP

    ReplyDelete
  10. Silt fence around the perimeter of our site, and it helped tremendously with sediment control. Great product, and it’s easy to maintain!

    ReplyDelete